top of page

Structural
Design

Our team loves bridges. Like really, really loves bridges. Let us help you with your bridge.

We have the engineering expertise for your structural needs

Our team of engineering experts has extensive knowledge in structural design, assessment, construction, maintenance, demolition and disaster recovery processes. This includes multi-disciplinary coordination of these processes for civil, coastal, marine, utilities and vertical asset activities.

 

Our team also includes construction experts who ensure your project is constructed in the most efficient way by incorporating construction methods and techniques into the design.

 

One of our specialties is bridge design. We have experience in designing bridges ranging from 6m long to 641m long, with spans up to 75m. This includes the design of concrete, prestressed concrete, steel girders, bored and driven piles, and shallow foundations.

image (8).png

Specialist bridge seismic design

At Hoffcon we love a challenge and the design of bridges for earthquakes in New Zealand can be exactly that.

 

We have design expertise in all levels of seismic design and analysis complexity, from force-based equivalent static design through to non-linear time-history analysis and everything in between.

 

We have experience in isolating bridges from earthquakes using lead-rubber bearing or by allowing them to slide on the ground. We deliver cost-effective design solutions that can achieve a superior level of service following a large event than more traditional methods.

 

We are also more than comfortable designing for liquefaction and soil movements in locations where the ground around a bridge is known to be unstable as a result of earthquake shaking.

image (9).png


Accelerated bridge construction

Construction is an expensive business.

 

Typically, the more time taken to construct an asset, the more it costs and the bigger the effects on the surrounding environment.

 

Accelerated construction techniques allow for works to be completed largely offline and in a more controlled environment.

 

This produces better quality and safety outcomes for the project and in turn, better financial and programme outcomes for the constructor and the client.

 

Hoffcon has extensive experience in design and construction using accelerated construction techniques.

BRIDGE.jpg

Perry Cycle Bridge, Horotiu

Rongomau Footbridge, MacKays to Peka Peka Expressway

Wharemauku Stream Crossing, MacKays to Peka Peka Expressway

Our bridge experts

Dave background (1)_edited_edited.jpg
 David Hoffman 
Director
Dave background (1)_edited.jpg
Anton background_edited_edited.jpg
 Anton Kivell 
Senior Structural Engineer (Bridges)
Anton background_edited.jpg
bottom of page